It was back to Nahuru, and back to work, for the team on Day 11, after their incredible game park experience. More of the loading, unloading and distribution of mobility devices had to be done. This can be hot, hard, dirty work at times, but our team members have kept at it, and have maintained their planned distribution schedule. An memorable adorable little girl who could not walk was fitted into a wheelchair, and her grateful smile, along with that of her father, made it all worth it.